The wastewater treatment facility operators at a city in Missouri wanted better digester performance. They needed a better settling sludge and a higher volume of decants, as well as more room to waste sludge within their existing digesters. The options to dispose of the digested sludge were becoming more and more scarce.
After trialing 3 products, they found BIO ENERGIZER® reduced their solids the best. Significant improvement in settling as well as a significant reduction in the total solids occurred in their digesters. They have achieved up to 85% volatile solids destruction using BIO ENERGIZER®. Another benefit that the City has gained is increased decant volumes. The City has doubled the number of decants by using BIO ENERGIZER® compared with other products previously used. This all results in lower hauling and handling costs. All it takes is a peristaltic pump and the product to get you similar savings!
Click here to read the full report.
Click here for more information regarding Bio Energizer®.
Related Posts
Are You Using Wastewater Bioindicators?
By Jael Batty Water quality can be evaluated quickly, efficiently, and cost-effectively through the use of bioindicators. The presence and activities of microorganisms can indicate changes in system operations and point to the source and magnitude of an issue.1 Protozoa Approximately 4% of the microorganisms in wastewater are protozoa, which are single-celled aerobic microorganisms. Protozoa
Get the “P” Out of There!
By Heather Jennings, PE Phosphorus is one of the most abundant elements on earth. It’s essential for adenosine triphosphate (ATP), the energy carrier life is built on. But in excess in our lakes and ponds, we see large algal growths occurring. Many times, these algal blooms suffocate the surrounding aquatic life and or produce toxins
Water Master Plans
By Heather Jennings, PE When I worked with engineering firms, there were a lot of water master plans being developed. Many of them were updates, as the plans had been around for 5–10 years and needed revision. Some master plans evaluated water and wastewater systems from scratch. All of these were interesting to me due