By Heather Jennings, PE

With warmer weather it is easy to capitalize on those microorganisms that have been suppressed during the cooler months. A good example of this is a system we worked with in New Mexico that was dealing with irregular sludge build-up in their three lagoons. The system was modified to run in series relative to the influent rather than the short circuiting that took the first pond out of use. A 6-month test (later extended to 300 days) was developed in which Bio Energizer®, a bio stimulant, was administered to make nutrients more available to wastewater microorganisms.
Results: Pond 1 had a 12% sludge reduction, Pond 2 had a 36% reduction, and Pond 3 had a 24% reduction. The great thing is that no dredging expense was necessary, just daily application of Bio Energizer®.
To download/read the case study. click here for English or here for Spanish.
Related Posts
New Video: 8 Essential Products for Wastewater Bioremediation
n this video, Heather Jennings, PE, Director of Probiotic Solutions®, provides an introduction to 8 essential products for wastewater bioremediation.
Water Master Plans
By Heather Jennings, PE When I worked with engineering firms, there were a lot of water master plans being developed. Many of them were updates, as the plans had been around for 5–10 years and needed revision. Some master plans evaluated water and wastewater systems from scratch. All of these were interesting to me due
Huma Gro® Fertilizer Products Increase Cucumber Yields at ROI of 113%
The Huma Gro® fertilizer treatment increased the cucumber yield by 2% (8 bushels per acre) over the Check, with a return on investment (ROI) of 113%.