MicroPlex® LM
Benefits of Use:
- MicroPlex® LM should be mixed with water and then sprayed over or sprinkled directly into the manure pit with mixing, or poured directly into the flow of water entering the lagoon.
- To break up a crust on a pit, use Crust Removal Application amount once per week, two weeks prior to pumping, and agitate the pit after each application.
FAQs
Related Products
Related Case Studies
Bio Energizer® Reduces Sludge at Small N.M. Municipal Facility
Problem A small town in New Mexico (pop. 1,300) had a municipal wastewater system with a flow rate of 50,000 gallons per day. The system included a series of three lagoons that tapered to a depth of 13 feet. Pond 1 had an average sludge depth of 1.9 feet, Pond 2 averaged 3.5 feet, and
Bio Energizer® Reduces Costs and Turbidity in Paperboard Lagoons at Kentucky Papermill Wastewater Facility
Problem A paper mill wastewater facility was treating 940 tons of paper bags, recycled linerboard, and corrugating medium, daily. The mill was interested in improving wastewater operating efficiency and lowering operating expenses over their standard polymer usage. The plant was experiencing filamentous bacteria, solids, and bulking issues in the final clarifier. It was discharging 4,000
Super Phos® Lowers Papermill Operating Costs in China
Problem The existing wastewater treatment system uses 600 kg/day of diammonium phosphate (DAP) to provide the needed phosphorus concentration to maintain a healthy microbial population to treat wastewater. These microorganisms break down the organic matter being discharged from the paper processing facility. Without the correct concentration of available phosphorus, the microorganisms are unable to grow
Related Blog Posts
White Paper: Lagoons—Under the Surface
An In-Depth Investigation of Bioremediation and Biological Factors Involved in Reducing Sludge at a Municipal Wastewater Treatment Facility Lagoon System Heather Jennings, PE, Sr. Project Engineer, Probiotic Solutions® Abstract In this study, the operators of a municipal wastewater treatment facility with 4 lagoons had determined that their 2 primary lagoons—10-foot-deep, with 25-million-gallon holding capacity each—had
Your Wastewater System Runs Smoothly, Until It Doesn’t!
By Heather Jennings, PE The first thing I usually hear from operators is that they don’t have any problems! Everything runs perfectly, all the time, until it doesn’t. Then the heartburn, extra hours, and long days begin. The only other thing as sure as death and taxes for a wastewater system is that it will
Bio Energizer® Cuts Sludge Hauling Costs for Potato Wastewater Treatment Plant
A wastewater treatment plant in Pennsylvania was experiencing process control problems when new potato waste stream flows increased by 26%. The additional load was causing filamentous issues in the sequencing batch reactor (SBR), settlability problems, and increased sludge hauling costs. The engineer was unable to maintain the 8-foot decant level in the sequencing batch reactor